Risk-based Assessment Criteria
Scale of problem determines need for site-specific risk-based approach
- Small localized hotspots vs. broad-scale low-level contamination
For large disperse sites, no “knee in the curve”
- need risk based approach to achieve best cost/benefit
Over long implementation times for large sites, natural attenuation may achieve comparable results as remediation