Table of Contents
Second Annual Report of the RTDF TPH
Subgroup Cooperative Field Trials
Thirteen RTDF Field Site Locations
Standardized Protocol
Standardized Protocol
Standardized Protocol
Standardized Protocol:Plant Hydrocarbon
Uptake
Site A – May 2001Hydrocarbon Uptake
Sampling
Four New Plantings
Revised Layout of Site I
Summary of Preliminary Results
Data Analysis
Site A -- Refinery Site: Three Complete
Growing Seasons
Site A -- Treatment Means
Site A – TPH Plot Data 0-15 cm
Site A – Example Chromatogram 0-15
cm
Site B
Site B -- Treatment Means
Site F – Manufactured Gas Plant Site
Site F – Priority Pollutant PAHTreatment
Means
Site F – Mean PAHs at 0,6, and 18 months
– 0-20 cm
Site G Motor Pool Waste Lagoon
Sediments
Site G RTDFExperimental Design
Site G – Treatment Means
Site G – Mean PAHs at 0 and 12 months
– 0-15 cm
Site K – Manufactured Gas Plant Site
Site K -- Total Priority Pollutant
PAHs Normalized to BGP 0 – 60 cm
Site K -- Total Priority Pollutant
PAHs Normalized to BGP 120 - 180 cm
Mean Root Length Densityat 0 – 15
cm
Summary of Preliminary Results
Supporting Research using RTDF Sites
The Future
Feedback
Acknowledgements
|